Delivery and Installation

The Bionic Barrier has been designed for efficient delivery and installation. The barrier is assembled at the factory in sections, and is designed to be folded to exactly fit the dimensions of a pallet. This ensures maximum efficiency for delivery of the barrier, and also improves installation processes. The barrier is delivered to the beach location in a sea container and the barrier is simply unfolded and floated out into the water, where it is secured in place by a professional dive team. This smooth process has been designed for minimal disruption to the beach and beach users.